Zero to 150: Building a Malaysian Production Hub in Twelve Months
Server Manufacturing· Malaysia
以下案例由 J&L Apex Advisory 創始團隊在過往領導及顧問任務中交付完成。為保護保密性,客戶身份及部分細節已隱去或概括處理;專案範圍、時間線與成果均如實呈現。
此內容目前僅提供英文版本。
挑戰
US tariff exposure required a functional overseas production hub — from site research to a fully staffed operation — under severe time pressure.
解決方案
A “0-to-100” capacity expansion covering on-the-ground site research, office setup and rapid local hiring through local agencies and EOR providers, alongside managed relocation of Chinese specialists to support production ramp-up.
成果
A fully operational hub with around 150 locally integrated employees supporting monthly production capacity in the thousands — and the client's tariff risk structurally mitigated.
關鍵指標
12 mo
Time to full operation
~150
Employees hired