挑战

US tariff exposure required a functional overseas production hub — from site research to a fully staffed operation — under severe time pressure.

解决方案

A “0-to-100” capacity expansion covering on-the-ground site research, office setup and rapid local hiring through local agencies and EOR providers, alongside managed relocation of Chinese specialists to support production ramp-up.

成果

A fully operational hub with around 150 locally integrated employees supporting monthly production capacity in the thousands — and the client's tariff risk structurally mitigated.

关键指标

12 mo

Time to full operation

~150

Employees hired